Diagnostic procedure
|
STEP
|
INSPECTION
|
ACTION
|
|
|---|---|---|---|
|
1
|
VERIFY WHETHER MALFUNCTION IS IN WIRING HARNESS (BETWEEN 2C TERMINAL OF PCM AND GROUND)
• Turn ignition key to OFF.
• Disconnect PCM connector.
• Turn ignition key ON (engine OFF).
• Measure voltage between terminal 2C of PCM connector (harness side) and GND.
Voltage Approx. 5 V
• Is voltage as specified?
|
Yes
|
Go to Step 4.
|
|
No
|
Go to next step.
|
||
|
2
|
INSPECT WIRING HARNESS BETWEEN ABS/TCS HU/CM AND PCM FOR CONTINUITY
• Turn ignition key to OFF.
• Disconnect ABS/TCS HU/CM connector.
• Connect SST (adapter harness) to ABS/TCS HU/CM (harness side).
• Inspect for continuity between terminal 2C of PCM harness side and terminal L of SST (adapter harness).
• Is there continuity?
|
Yes
|
Go to next Step.
|
|
No
|
Repair or replace harness, then go to Step 5.
|
||
|
3
|
INSPECT WIRING HARNESS BETWEEN 2C TERMINAL OF PCM AND GROUND FOR SHORT TO GROUND
• Inspect continuity between terminal 2C of PCM harness side and ground.
• Is there continuity?
|
Yes
|
Repair or replace harness, then go to Step 5.
|
|
No
|
Go to Step 5.
|
||
|
4
|
INSPECT VOLTAGE PATTERN AT TERMINAL L OF ABS/TCS HU/CM
• Connect PCM connector and SST (adapter harness) to ABS/TCS HU/CM (ABS/TCS HU/CM side).
• Turn ignition key to ON.
• Inspect voltage pattern at ABS/TCS HU/CM terminal L using oscilloscope.
|
Yes
|
Go to Step 5.
|
|
No
|
Replace PCM, then go to Step 5.
|
||
|
|||
|
• Is voltage pattern as specified?
|
|||
|
5
|
VERIFY TROUBLESHOOTING COMPLETED
• Clear DTC from memory.
(See Clearing DTCs Procedure)
• Is the same DTC present?
|
Yes
|
Replace ABS/TCS HU/CM, then go to next step.
|
|
No
|
Go to next step.
|
||
|
6
|
VERIFY AFTER REPAIR PROCEDURE
• Is there any DTC present?
|
Yes
|
Go to applicable DTC inspection.
|
|
No
|
Troubleshooting completed.
|
||